Blame

3cdf6f spikej555 2025-03-21 23:24:24
This page is a stub. You can help by editing it!
1
# Highway 25
2
1ad00b spikej555 2025-03-22 06:17:35
Added some pictures.
3
Highway 25 is a multimodal, limited access highway connecting [[Brynhild|Regions/Brynhild]] and [[Arioyund|Regions/Arioyund]], and the only major roadway between the [[regions|Regions]]. It largely consists of bridges and tunnels, with very little of it at grade. Up to -10'000 Z (North), it is maintained by the [[Arioyund Department of Transportation|Agencies/Arioyund Department of Transportation]], and beyond that by the [[Brynhild Department of Transportation|Agencies/Brynhild Department of Public Works]]. It has a single lane protected Ice Express, and a two-block portion shared by a rail line and pedestrian traffic. Its single-elevation design allows all users to enjoy the beautiful views presented from its elevated segments, and makes boat travel simple.
4
5
![](./image-1742623920878.png)
6
_A bridge carrying Highway 25 over a jungle between Exit 52 in Brynhild and its interchange with Highway 54_
7
8
9
### Route
10
Highway 25's current Southern Terminus is with [[Highway 5|Transit/Routes/Highway 5]] in Arioyund. From there, it travels North.
11
bf43bc spikej555 2025-04-11 23:24:12
Added Exits up to 175
12
>| # Exit 33
13
>| Exit 33 provides local access VIA water elevator. At the base, there is a small farm.
14
>| ![](./image-1744411833288.49.52.png)
15
>| _Exit 33, 2025 April 11th_
16
17
>| # Exit 116
18
>| Exit 116 boasts ADoT's first Rest Area. There is a small, two-bed sleeping area as well as a garden.
19
>|
20
>| ![](./image-1744412311576.57.32.png)
21
>| _Exit 116 on 2025 April 11th_
22
23
>| # Exit 145
24
>| Exit 145 provides access to the local river, as well as a pretty stunning cave system through a series of stairs and ladders.
25
>|
26
>| ![](./image-1744412781554.04.27.png)
27
>|
28
>| ![](./image-1744412841713.07.07.png)
29
>| _Exit 145 on 2025 April 11th_
30
31
At this point, Highway 25 enters a 258 meter tunnel. For the duration of this tunnel, the minecart track shifts to the edge to be against the tunnel wall.
32
>| # Exit 175
33
>| Exit 175 provides local access by way of a short, 1 block wide staircase. Services include a rest area, garden, minecarts, and boats.
34
>| Future plans exist to connect this exit to N 135th Street by way of a path to the [[Jessie O' Felzland Memorial Bridge|Transit/Bridges/Jessie O' Felzland Memorial Bridge]].
35
>|
36
>| ![](./image-1744413522242.16.54.png)
37
>| _Exit 175 on 2025 April 11th_
1ad00b spikej555 2025-03-22 06:17:35
Added some pictures.
38
4f724e spikej555 2025-04-12 00:29:53
Added more exits
39
>| # Exit 181
40
>| Exit 181 provides beach access. There is no Ice Express exit here.
41
>|
42
>| ![](./image-1744416320127.33.47.png)
43
>| _Exit 181 on 2025 April 11th_
44
45
>| # Exit 583
46
>| Exit 583 provides access to a nearby Woodland Mansion by way of a boat dock and a lit path, as well as access to a lookout.
47
>|
48
>| ![](./image-1744417329017.20.55.png)
49
>| _Exit 583, the boat dock, and path to the woodland mansion on 2025 April 11th_
50
>|
51
>| ![](./image-1744417532899.25.09.png)
52
>| _The view from the lookout at sunrise. Taken 2025 April 11th_
53
efdc5e spikej555 2025-04-17 02:11:26
Completed documentation, current as of 2025 April 16th.
54
>| # Exit 822
55
>| Exit 822 provides access to a staircase going up the mountainside
56
>|
57
>| ![](./image-1744428442515.25.04.png)
58
>| _Exit 822, 2025 April 11th_
59
60
>| # Exit 837
61
>| Exit 837 provides access to a staircase to a mountain plain where several holes to the highway below are fenced off
62
>|
63
>| ![](./image-1744428733282.31.05.png)
64
>| _Exit 837, 2025 April 11th_
65
66
>| # Exit 840
67
>| Exit 840 provides access to a staircase going up the mountainside, as well as beach access. There is also a small garden on the way to the beach.
68
>|
69
>| ![](./image-1744428894697.33.51.png)
70
>| _Exit 840, 2025 April 11th_
71
72
>| # Exit 920
73
>| Exit 920 provides access to a staircase going up the mountainside
74
>|
75
>| ![](./image-1744429016401.36.16.png)
76
>| _Exit 920, 2025 April 11th_
77
78
>| # Arioyund/Brynhild Border
79
>| The [[Arioyund|Regions/Arioyund]]/[[Brynhild|Regions/Brynhild]]
80
>|
81
>| ![](./image-1744429132922.38.05.png)
82
>| ![](./image-1744429197532.38.17.png)
83
>| _2025 April 11th_
84
85
>| # Exit 277
86
>| Exit 277 provides access to the Valley Village Reservation. Services include the village farms and buildings, which are available for use by visitors passing through.
87
>|
88
>| ![](./image-1744429745426.46.59.png)
89
>| _Exit 277, 2025 April 11th_
90
91
>| # Exit 307
92
>| Exit 307 provides access to a nearby pillager outpost.
93
>|
94
>| ![](./image-1744429858316.49.50.png)
95
>| _Exit 307, 2025 April 11th_
96
97
>| # Exit 345
98
>| Exit 345 provides access to a nearby village.
99
>|
100
>| ![](./image-1744429995990.52.41.png)
101
>| _Exit 345, 2025 April 11th_
4f724e spikej555 2025-04-12 00:29:53
Added more exits
102
efdc5e spikej555 2025-04-17 02:11:26
Completed documentation, current as of 2025 April 16th.
103
>| # Highway 325
104
>| Highway 325 is a spur of Highway 25 that branches off at Z = -13662. Plans are for it to travel east to a stronghold.
105
>|
106
>| ![](./image-1744821734946.png)
107
>| _Junction of Highway 325 and Highway 25 on 2025 April 15th_
108
109
>| # Exit 520
110
>| Exit 520 provides local access. There are no services.
111
>|
112
>| ![](./image-1742624039402.png)
113
114
>| # Ayrith Interchange (Junction 25/54)
115
>| The Ayrith Interchange is a tower where Highway 25 and [[Highway 54|Transit/Routes/Highway 54]] meet. Rail/Pedestrians and the Ice Express are grade-separated at the interchange, and all rail lines have terminuses at the interchange, requiring manual switching of lines.
116
>|
117
>| ![](./image-1744855621585.png)
118
>| ![](./image-1744855671498.png)
119
>| _Pictures of the Ayrith Interchange, taken 2025 April 16th_
1ad00b spikej555 2025-03-22 06:17:35
Added some pictures.
120
121
efdc5e spikej555 2025-04-17 02:11:26
Completed documentation, current as of 2025 April 16th.
122
There are plans to expand it north indefinitely, but currently it dead ends not far north of Highway 54. Future plans include grade-separated rail, pedestrian, and ice express paths, as well as multi-track rail to support the planned industrial area in the savannah further north.